NO TITLE
Keywords:
optimization, drilling, blasting, production, limestone and mineAbstract
This project aims to optimize the drilling and blasting scheme today, where limestone pro- duction increased from 10000 to 20000 tons/ month, from a technical, rational and environ- mentally feasible, for which bibliographic infor- mation was collected from previous studies. This for porpoise a redesign of the mesh used at the start of ore, with larger diameters and lengths of shots, changing the initiation system and blasting accessories.
Downloads
Published
2024-03-14
Issue
Section
Artículos
How to Cite
NO TITLE. (2024). Investigación Escuela Ingenieros Militares, 5. https://ingenierosmilitares.edu.co/esingmilco/index.php/cidim/article/view/127